2018 Project Review
Topics - Review
“Knowing yourself is the beginning of all wisdom.” ― Aristotle
Editor Note:
- Any employment-oriented material has been framed with a limited and abstracted approach.
- Document Purpose: Reflect on major technical projects in 2018.
Sources:
- Photo source by The Forest Simon on Unsplash
Projects
Optimistic Bearings
Summary: Mistakes/Failures: Enjoyed: Leadership: Conflicts: Do differently:
GTO
Summary:
- Upgrades and repairs.
- Electronic ignition module to replace mechanical points. Ignition coil. Carb rebuild.
- Brake system major system overhaul (full system replacement(booster, master, all lines, calipers, drums, fluid)).
Mistakes/Failures:
- Ignition System
- Multiple changes created more difficult troubleshooting post installation.
- Install was sound, carb linkages were altered during reassembly creating a fuel tuning issue that masked as a spark problem
- Multiple changes created more difficult troubleshooting post installation.
- Brakes
- Multiple changes created more difficult troubleshooting post installation.
- Bleeding a full system replacement with all new lines was new and hard.
- Freak issue with seating/sealing front caliper hoses onto caliper body
- Multiple changes created more difficult troubleshooting post installation.
Enjoyed:
Ignition
- Reduction in complexity and mechanical decay factor.
- Improved “Spring Shakeout” experience going forward.
Brakes
- Major increase in safety and reliability
- Some braking performance improvement
Learning
- Big learning experience, very rewarding.
Leadership: N/A
Conflicts:
- Time
- Post installation troubleshooting was timing consuming, demoralizing, and draining.
Do differently:
More discipline around isolating changes. This is challenging b/c of mechanical assembly time costs.
Log Pump
Summary: Mistakes/Failures: Enjoyed: Leadership: Conflicts: Do differently:
Azure Business Case
Summary: Mistakes/Failures: Enjoyed: Leadership: Conflicts: Do differently: