/ ABOUT

2018 Project Review

Topics - Review

“Knowing yourself is the beginning of all wisdom.” ― Aristotle

Editor Note:

  • Any employment-oriented material has been framed with a limited and abstracted approach.
  • Document Purpose: Reflect on major technical projects in 2018.

Sources:

  • Photo source by The Forest Simon on Unsplash

Projects

Optimistic Bearings

Summary: Mistakes/Failures: Enjoyed: Leadership: Conflicts: Do differently:

GTO

Summary:

  • Upgrades and repairs.
    • Electronic ignition module to replace mechanical points. Ignition coil. Carb rebuild.
    • Brake system major system overhaul (full system replacement(booster, master, all lines, calipers, drums, fluid)).

Mistakes/Failures:

  • Ignition System
    • Multiple changes created more difficult troubleshooting post installation.
      • Install was sound, carb linkages were altered during reassembly creating a fuel tuning issue that masked as a spark problem
  • Brakes
    • Multiple changes created more difficult troubleshooting post installation.
      • Bleeding a full system replacement with all new lines was new and hard.
      • Freak issue with seating/sealing front caliper hoses onto caliper body

Enjoyed:

Ignition

  • Reduction in complexity and mechanical decay factor.
  • Improved “Spring Shakeout” experience going forward.

Brakes

  • Major increase in safety and reliability
  • Some braking performance improvement

Learning

  • Big learning experience, very rewarding.

Leadership: N/A

Conflicts:

  • Time
  • Post installation troubleshooting was timing consuming, demoralizing, and draining.

Do differently:

More discipline around isolating changes. This is challenging b/c of mechanical assembly time costs.

Log Pump

Summary: Mistakes/Failures: Enjoyed: Leadership: Conflicts: Do differently:

Azure Business Case

Summary: Mistakes/Failures: Enjoyed: Leadership: Conflicts: Do differently: